Rex Christian PPJ #6

Completed Tasks

-Modeling Ruined Buildings (4 hours)

-UVing All Building Assets (1 hour)
Total Hours: 5 hours

Samples:




What went right: We talked a lot about the scope of the game and what we plan to finish in our meetings, which was very much needed. Art tasks were distributed pretty clearly, with mine being making some decrepit/destroyed buildings for the city level.

What went wrong: I feel like we simply didn't produce enough art this week. We should have, at least, made assets for the entire city level, but we didn't really decide what else the level needed aside from buildings.
Upcoming: Finalized city layout, then make assets for all of it.

Comments

Popular posts from this blog

Peter Eldredge PPJ #1

Rex Christian Personal Postmortem

Ethan Scheidlmeier PPJ 9